Menu

Kitchen and Bathroom Remodel Cost: The Price Ranges 138 Remodelers Publish

Where the published prices of 84 kitchen remodelers and 105 bathroom remodelers in 46 US cities start and stop, read on their own websites on November 14, 2026, with a bid checker, hall bath against primary bath and what the Census says owners spend.

Updated

A kitchen halfway through a remodel, with new white cabinets installed, bare plywood where the counters will go and drop cloths on the floor

The typical kitchen remodeler in our sample starts its published prices at $29,000 and names $100,000 as the top of its range. For a bathroom the typical starting figure is $15,000 and the typical top is $60,000. On November 14, 2026 we opened the pricing pages, cost guides and FAQs of 138 remodeling companies in 46 US cities and wrote down the range each one gives for its own work. Half of the kitchen companies begin somewhere between $17,750 and $49,250, and half of the bathroom companies between $10,000 and $25,000.

Does the bid you got fit what remodelers publish?

Choose the room and type the total of the bid. Each line below is one company: it starts where its price list starts and ends at the top figure it publishes. A dot means the company gives only a starting price.

The same companies as a table

The reference ranges, and where each comes from

For our own sample, the range is the middle half of the companies: a quarter publish less and a quarter publish more. The Census figures are what homeowners said they spent, including jobs they did themselves.

ConceptReference rangeWhere it comes from
Kitchen remodel, where price lists start$17,750 to $49,250median $29,000Pricing pages of 84 kitchen remodelers in 38 cities, read November 14, 2026
Kitchen remodel, top of the published range$60,000 to $150,000median $100,000The 68 of those 84 that publish an upper figure
Bathroom remodel, where price lists start$10,000 to $25,000median $15,000Pricing pages of 105 bathroom remodelers in 41 cities, read November 14, 2026
Bathroom remodel, top of the published range$40,000 to $85,000median $60,000The 81 of those 105 that publish an upper figure
Hall or guest bath against primary bath, starting price$22,500 against $37,500mediansThe 22 bathroom companies that price both kinds of bath separately
What owners spent on a kitchen remodel, 2021 to 2023$8,000median2023 American Housing Survey, Census Bureau and HUD
What owners spent on a bathroom remodel, 2021 to 2023$5,000median2023 American Housing Survey, Census Bureau and HUD

The Census medians sit far below the starting price most contractors publish because they count every kitchen or bath project an owner reported, small updates included, and the same survey counts 50 million of 140 million home improvement projects as done by the owners themselves. Its totals work out to about $16,600 per kitchen project ($83.1 billion over 5.0 million projects) and about $9,200 per bathroom project ($68.9 billion over 7.5 million). That division is ours.

Where the price lists begin

How many companies put the bottom of their kitchen or bathroom pricing in each band. A low first number often belongs to a cosmetic refresh that keeps the cabinets or the tub, so read it as an entry point and not as the price of a full remodel.

Kitchen remodelers (84)

As a table

Bathroom remodelers (105)

As a table

A primary bath starts at almost twice a hall bath

$22,500

Median starting price for a hall, guest or kids' bath, among the 22 companies that publish both figures.

$37,500

Median starting price for a primary bath at the same companies. For the typical company the primary bath starts 1.9 times higher. Companies describe it as the larger room, often with a double vanity, a bigger tiled shower and a separate tub.

Several price lists also give a figure for a tub-to-shower conversion or a shower replacement on its own, from about $7,500 to $30,000 in the companies we read. We did not count those jobs as bathroom remodels, so they are not in the ranges above. The walk-in shower button inside each bathroom remodelers list keeps the companies that do these conversions.

Why two bids for the same kitchen can be far apart

The layout moves or it stays

Price lists that split by scope put a moved sink, range or wall in a higher tier. A Houston kitchen remodeler publishes $28,000 to $50,000 when the layout stays and $50,000 to $88,000 when it changes, and a Las Vegas company gives $30,000 to $63,000 against $63,000 to $126,000 or more.

The cabinet line

Four companies in Las Vegas, San Jose and Sacramento say how much of a kitchen budget goes to cabinets, and their answers run from a fifth to two fifths. A bid with stock cabinets and one with custom cabinetry are not the same kitchen, even when the drawings match.

What the total includes

One Cincinnati company says its planning ranges include appliances and flooring, while an Ohio remodeler's averages leave appliances out. Design can be inside the price or a separate fee: a Pittsburgh firm lists its design fee from $3,000, and a Portland design-build company says its starting prices include design and permits.

Primary suite or powder room

Bathroom price lists move with the room more than with the finish. One Cincinnati firm starts powder rooms at $20,000 and primary baths at $75,000, so check that two bids describe the same room and the same fixtures.

The state moves the published figures less than the room and the scope do. The 20 California kitchen companies in our sample start at a median of $27,500 and the 18 that give a top figure stop at a median of $92,500, close to the rest of the country. Many California remodelers publish a low entry tier for a refresh.

Questions to settle before you sign a remodeling bid

  1. Are the bids pricing the same job? Ask every company for the same layout, the same cabinet line or allowance, the same countertop and the same fixtures. Allowances that are too low come back later as change orders.
  2. What is left out? Appliances, flooring, design, permits, debris haul-off, drywall repair beyond the room and the paint finish are the lines that move most between companies.
  3. How is the payment split? Tie each payment to a stage you can see. Several states cap what a remodeler can take before work starts, and our guide to deposit and contract rules by state has the figure for yours.
  4. Who pulls the permit? The company should say so in writing, and the final payment should wait for the final inspection.
  5. Was the house built before 1978? Then a company paid to disturb more than a small patch of painted surface must be lead-safe certified. Our page on lead paint and remodeling explains what that changes on site.
  6. How are changes handled? Ask for written, priced change orders signed before the extra work starts.

How the 138 price lists were read

We started from the companies on RemodelRank whose websites publish a price for a kitchen or a bathroom remodel and opened every one of those pages again on November 14, 2026. For each company and room we kept two numbers: the bottom of the range it publishes for a remodel of that room, and the top figure it gives, when it gives one. A company that writes "from $45,000" counts with a starting price and no top. Cosmetic refresh tiers count when the company lists them as a remodel tier.

We left out what is not the price of a remodel: cabinet-only packages, countertop or cabinet painting jobs, tub and shower swaps, design fees, outdoor kitchens, sale offers, monthly payment teasers, labor-only figures and every number a company quotes from someone else's survey or report. A company with several pages counts once per room. The result is 84 kitchen remodelers and 105 bathroom remodelers, 138 companies in all, 51 of them pricing both rooms.

Our lists of kitchen remodelers, bathroom remodelers and general contractors are not ordered by price, and the 138 companies read for this page are a sample of published prices, never a ranking.

The Census figures come from the 2023 American Housing Survey of the Census Bureau and HUD, in its summary of home improvements. Company, city, page and figures for every price we read are kept on file. Where the data on RemodelRank comes from.